How to Source CNC Parts from Turkey

A step-by-step guide covering RFQ preparation, supplier vetting, lead times and quality documentation when sourcing CNC machined parts from Turkey.

Published: · Updated: · By Gökhan D., Founder & Managing Director, CNC Turkey

CNC machined component ready for RFQ
Precision manufacturing from Türkiye

Buyer's guide · sample to series

From drawing to series production: buyer's guide

Eleven steps with one contact and one production plan: sample and approval first, then series production on a frozen plan and delivery to Europe.

  1. 01 Drawing and RFQ PDF drawing, STEP model, material, quantity
  2. 02 Technical review and quote Within 2 business days, with a written route
  3. 03 Sample order Sample quantity and any sample fee stated in the quote
  4. 04 Sample and first article inspection (FAI) 1–4 weeks; dimensional report and material certificate
  5. 05 Your approval Approved: series starts. Changes needed: drawing or process revised, new sample
  6. 06 Series release Drawing revision, critical characteristics and inspection plan are frozen
  7. 07 Pilot batch (optional) Small first lot before full volume; skip it and go straight to series
  8. 08 Series production 2–10 weeks; heat treatment or coating adds about 1 week
  9. 09 Batch inspection Dimensional report and material certificate with every shipment
  10. 10 Export packing and documents A.TR for EU deliveries and customs documents
  11. 11 Delivery Road freight to Europe 3–6 days; repeat orders restart at 08

Quick action

Send your technical drawing. Single-part drawings: first technical reply in 2 business days; multi-part packages: timeline confirmed when files arrive.

Upload Your Drawing

No account needed · or email: info@cnc-turkey.com

Why Source CNC Parts from Turkey?

Turkey has over four decades of precision machining heritage. Istanbul's manufacturing belt hosts thousands of CNC turning and milling machines capable of handling international production volumes — at cost structures well below Western Europe.

Raw material sourcing for carbon steel, alloy steel, stainless steel (304/316L) and aluminium alloys is straightforward. Heat treatment and coating can often be coordinated within the same supply chain.

Step 1: Prepare Your Technical Drawing

A well-prepared technical drawing speeds up the quotation and reduces back-and-forth. Make sure yours includes: all critical tolerances (ISO 286 or ASME Y14.5), material specification (e.g. 1.4404 / 316L), surface roughness (Ra value), heat treatment requirements and coating/surface finish.

  • ✓Technical drawing in PDF or STEP format
  • ✓All critical dimensions and tolerances marked
  • ✓Material and hardness specification
  • ✓Surface roughness requirements (Ra)
  • ✓Quantity and target unit price (if applicable)

Step 2: Vetting a Supplier

Most Turkish CNC workshops do not handle international sales directly. Working with an experienced export coordinator who can translate technical requirements, manage quality expectations and handle export documentation simplifies the entire process.

During vetting, ask these questions:

  • ✓Can they provide references and sample production photos for similar parts?
  • ✓Can they supply EN 10204 3.1 material certificates?
  • ✓Is a dimensional inspection report (CMM or conventional) available?
  • ✓Do they have export experience and can they prepare commercial invoices and customs documents?
Packed CNC parts ready for export

Lead Times: What to Expect

Prototype quantities typically require 2-3 weeks from drawing approval. Small series (10-100 parts) should be planned at 3-5 weeks. Larger series (500+ parts) vary by complexity but 6-8 weeks is a common range.

Factors that affect lead time: raw material availability (especially for special alloys), heat treatment and coating (typically outsourced), quality documentation preparation and export/customs processing.

Quality Documentation

International buyers typically request the following documentation with delivery: material certificate (EN 10204 3.1 or 2.2), dimensional inspection report, hardness test report (where heat treatment is applied) and surface coating certificate.

Clarifying these requirements at the quotation stage prevents surprises on delivery and allows for accurate total cost calculation.

Real work

See parts we have made

Real project photos. Send your drawing and we will review it and reply.

FAQ

Frequently asked questions

What is the minimum order quantity for CNC parts from Turkey?

Prototype orders can often start from 1-5 pieces. For series production, the minimum depends on part complexity and setup cost — typically 25-100 pieces is a practical starting point.

Can I get a quote without a technical drawing?

A firm quotation requires a technical drawing. However, a rough budget estimate can be provided with material type, dimensional envelope and quantity.

What are the typical payment terms?

For new buyers, typical terms are 30-50% deposit with the balance before shipment. For established buyers, net 30-45 day terms can be negotiated.